STEP-1 CLEANING

Professional installers thoroughly clean your windows with solution and scrapers.




STEP-2 SETTING THE SPACER

Laser welded spacers are set on your glass 1/4 inch from frame with polyisobutylene.




STEP-3 GLASS-ON

Installers precisely set second panel of glass in place on spacer.




STEP-4 HEATING

Heating wires in spacer are attached to a custom-made 110 volt transformer, and butyl is heated with electricity to bond and seal glass to spacers.




STEP-5 SILICONE AND FINISH TRIMS

High-quality glazing silicone is added to double seal the system and structurally hold second panel of glass.
Finish trims are added to match existing frames, covering spacers and silicone.




    Specification >>

    Steps of installation >>

    Warranty >>

    Rreferences >>

    Animation >>


© Add On Glass, Inc. All Rights Reserved.